2018 Fukushima Updates
/TEPCO aims to continue its investigation inside the No. 2 reactor at the Fukushima Daiichi Nuclear power plant. A 13 meter long pipe will be inserted into the bottom of the pressure vessel and a camera will be deployed through the pipe to find the the melted fuel. Radiation and temperature measurements will also be taken
Read More