Diablo Canyon: The Devil's in the Details; Part 2: A Mother's Work Is Never Done
/Utility owner Pacific Gas and Electric (PG&E) announced in June 2016 that it would shut down the Diablo Canyon nuclear power plant with its two atomic reactors by 2025 due to a joint proposal made by PG&E and several environmental and labor organizations. This action is neither the beginning nor the end to the decades long story of Diablo Canyon’s design, construction, and operation. PG&E’s promise to replace the nuclear power generated by Diablo Canyon’s two reactors with renewable energy and to no longer seek a 20-year license renewal for these atomic reactors still comes with significant costs.
Read More